Progress tracker

Track Your Way Through the Scheme

Four phases, each about eight steps. Every step sets out what it involves, what you need, and what to watch for.

Phase 1 of 4 · Steps 1–7

Preparing Your Application

0 of 7 steps done

  1. Step 1: Who can apply

    Portal status: Pre-application

    The scheme is open to homeowners in Donegal, Mayo, Clare, Limerick and Sligo. You must live in the home, or own one RTB-registered rental property that was registered by 1 November 2021. You do not need anything in hand to start reading.

    Documents needed

    Tips

    • Take clear photos and log when you first noticed the damage
    • Save every file in one dedicated folder
  2. Step 2: You notice cracks

    Portal status: Observation stage

    Record what you can see — stepped cracking, dampness, doors and windows that have started to stick. You are not diagnosing anything at this stage, only building a record. Damage usually worsens over winter, so a log over time is far more persuasive than a single photograph.

    Documents needed

    Tips

    • Let your phone stamp the date — do not rely on memory
    • Repeat the same angles every few months
  3. Step 3: Get professional advice (BCA)

    Portal status: BCA required

    Arrange a Building Condition Assessment with a registered engineer, architect, surveyor or building surveyor. This is the document the whole application rests on, so ask what the report will and will not cover before you engage anyone.

    Documents needed

    Tips

    • Ask other homeowners locally who they used
    • Keep copies of every report and invoice
    • Get the fee in writing before work starts
  4. Step 4: Your application

    Portal status: Application submitted

    Upload the BCA and your supporting documents through the Donegal DCB portal. Two of the required certificates come from Revenue and catch people out — both are obtained through Revenue MyAccount and both can take a few days to issue.

    Documents needed

    Tips

    • Screenshot every submission and confirmation email
    • Request the Revenue certificates a fortnight early
    • Save the reference number somewhere you will find it again
  5. Step 5: Your application is reviewed

    Portal status: Under review

    The council verifies your documents and forwards the application to the Housing Agency. This stage can be slow and quiet. Silence is normal; it does not mean anything has gone wrong.

    Documents needed

    Tips

    • Keep copies of every communication in both directions
    • Note the date and name for any phone call, then confirm it by email
  6. Step 6: Understanding your assessment

    Portal status: Assessment stage

    The Housing Agency decides whether your home meets the damage threshold and which remediation option applies — full demolition and rebuild, rebuilding the external walls, or re-rendering the affected walls. The option sets the grant, so this is the point to go through the figures with your engineer line by line.

    Documents needed

    Tips

    • Ask your professional to explain the options and the grant amounts
    • Work out the shortfall before you accept anything
  7. Step 7: Your next decision, or an appeal

    Portal status: Decision pending

    Accept the remediation recommendation, or appeal it using the Schedule 15 Notice of Appeal — the standard form for challenging a scheme decision. There is a fixed window, so do not wait to see whether things improve.

    Documents needed

    Tips

    • Make copies of everything you submit
    • Send it by recorded post and keep the receipt
    • Diary the deadline the day the decision arrives
Phase 2 of 4 · Steps 8–15

Preparing for the Build

0 of 8 steps done

  1. Step 8: Approval to proceed

    Portal status: Decision accepted

    Accept the remediation option and the grant. Planning and preparatory work can begin now — but do not start any building work yet.

    Documents needed

    Tips

    • Keep screenshots and emails
  2. Step 9: Preparation stage

    Portal status: Preparation stage

    Prepare plans, quotes and energy checks. Wait for the portal to prompt you before commencing works.

    Documents needed

    Tips

    • Organise every document in one folder
  3. Step 10: Confirm your building professional

    Portal status: Professional confirmation required

    Confirm the registered architect, engineer or surveyor who will prepare your remedial works plan.

    Documents needed

    Tips

    • Check their experience with defective concrete blocks specifically
  4. Step 11: Remedial works plan

    Portal status: Plan preparation

    Your professional prepares the plan setting out the scope and sequence of the work.

    Documents needed

    Tips

    • Keep copies for reference and for tracking costs later
  5. Step 12: Planning permission check

    Portal status: Planning assessment

    Confirm whether planning permission is required for your home.

    Documents needed

  6. Step 13: BER / energy assessment

    Portal status: BER / energy assessment

    An energy assessment may be required for building control compliance.

    Documents needed

    Tips

    • Only schedule the assessment when you are instructed to
  7. Step 14: SEAI grants (optional)

    Portal status: Energy grants considered

    You may be eligible for SEAI energy grants alongside the rebuild.

    Documents needed

  8. Step 15: Quotes and cost planning

    Portal status: Costing in progress

    Collect contractor quotes and review the costs and the timeline together.

    Documents needed

    Tips

    • Keep copies for submission and for comparison
Phase 3 of 4 · Steps 16–22

Rebuilding Your Home

0 of 7 steps done

  1. Step 16: Remedial works plan submission

    Portal status: Plan submitted

    Submit the remedial works plan and supporting documents through the portal.

    Documents needed

    Tips

    • Keep screenshots of every portal submission
  2. Step 17: Commencement notices

    Portal status: Pre-commencement

    Submit notices to the DCB Scheme (7–14 days before you start) and to Building Control (14–28 days before).

    Documents needed

    Tips

    • Diary both windows the moment you have a start date
  3. Step 18: Time limits

    Portal status: Timeframe awareness

    Works must be completed within 130 weeks — about two and a half years. The final grant claim must be submitted within 65 weeks of the works starting.

    Tips

    • Track both deadlines with a calendar or portal reminders
  4. Step 19: Approval to start works

    Portal status: Approved to commence

    Receive formal grant approval and confirm your start date.

    Documents needed

  5. Step 20: If issues arise later

    Portal status: Further information request

    The council may come back with a request for further information or clarification.

    Tips

    • Respond promptly and keep copies of all correspondence
  6. Step 21: Keeping records

    Portal status: Works underway

    Keep every invoice, receipt and photograph, and log anything the builders find on site.

    Tips

    • Photograph the work at each stage, not just at the end
  7. Step 22: Payment claims

    Portal status: Claim in progress

    Submit stage payment claims as the works reach each agreed milestone, with the invoices and evidence that support them.

    Documents needed

    Tips

    • Claim as each stage completes rather than saving them all up
Phase 4 of 4 · Steps 23–25

Final Steps

0 of 3 steps done

  1. Step 23: Inspections before the final claim

    Portal status: Inspection stage

    Attend the inspections and note any corrections that are required before you can claim.

    Tips

    • Ask for anything raised on site to be confirmed in writing
  2. Step 24: Final grant claim

    Portal status: Final claim submitted

    Submit the final grant claim with the full set of invoices, certificates and completion evidence. This must be within 65 weeks of the works starting.

    Documents needed

    Tips

    • Check the 65-week deadline before you begin assembling the claim
  3. Step 25: Final status

    Portal status: Complete

    Check the portal for completion, and keep every record safely. You may need them again.

    Tips

    • Keep the whole folder — do not throw anything out once it is signed off

If This Is Feeling Like Too Much

Plenty of people close the folder for a fortnight and come back to it. If the weight of it is getting heavier rather than lighter, there is emotional and mental-health support here, and the helplines are free.